Prescott v. Keep, in which Keep, Adams' client, was the original plaintiff, began with a complicated argument on a pleading point. The defendants sought to bar the action on the ground that the plaintiff had failed to join (bring in) his cotenants as coplaintiffs. The issues which seem to have been argued were whether defendants should have raised the point at the outset (that is, by plea in abatement), and whether, having pleaded the general issue, they would at the trial be prevented from introducing evidence bearing on the failure to join. If the court followed the authority set out in Adams' minutes (
Document I), the answer was that, since plaintiff's writ had not averred the cotenancy, defendants would not be allowed to raise the issue at the trial. In the related case of
Prescott v. Priest, the initial question was Adams' contention that the death of one of the original plaintiffs might cause the action itself to die. As Justice William Cushing's report (
Document IV) shows, the court ruled that it did not; Adams was then allowed to file an answer on the merits.
Once the technicalities clear away, the
Prescott cases illustrate neatly the legal problems that could arise over the right to use flowing water, here, Stony Brook in Westford. The Prescott family had long maintained a gristmill and a sawmill on the stream, near its source.
1 In 1720, old Jonas Prescott, his two sons, Jonas and Benjamin,
2 and three others had formed a joint venture to erect and maintain an iron forge on land owned by young Jonas slightly upstream from the mills.
3 The forge, of course, depended on water power to operate its bellows.
4
{p. 267}
By a complicated and sometimes obscure series of conveyances, a five-eighths interest in the forge had come to Jonathan Keep,
5 who apparently attempted to maintain and even improve the ironworks without the consent of the Prescott interests. The latter had other plans for the use of the available water, because in 1771, according to Keep, they altered the dam previously shared with the iron works and erected a new dam some thirty or forty rods upstream.
There were several issues between the parties. First, the Prescotts insisted that the original articles of 1720 governing the ironworks ought not to be construed to permit the holder of a majority interest to keep the works in operation without consent of the minority. Second, the Prescotts impugned Keep's title to the five-eighths interest; he was, they argued, merely leasing the use of the works from the Prescotts, a relationship which could terminate if the Prescotts so desired. Finally, it appears, the Prescotts claimed that, inasmuch as title to the land on which the forge stood, as well as to the relevant part of the stream itself, remained in the Prescott family, Keep had no right to the water. Keep denied all these contentions and instituted the first of the actions documented here (
Document I).
Meanwhile, Keep's apprentice, Joel Priest, had on various occasions removed the flume (or sluice) lever from the Prescotts' new dam, had shut down their mill gate (thus preventing diversion of the water), and had even broken the mill dam itself. The Prescotts thereupon sued Priest directly (Documents
II–IV
II, III, and IV
).
In both cases the Middlesex Inferior Court judgments resulted from sham demurrers.
6 Pleadings being reopened in the Superior Court, the technical arguments were determined, and after the usual continuances the matters went to trial. Adams, with Jonathan Sewall, represented Keep and Priest. The verdict for Keep was £40, but the Prescotts moved in arrest of judgment, and the matter did not conclude until 1776 when a file paper indicates that the parties settled the action.
7 In the other case the jury awarded the Prescotts damages of 40s. and costs of £19 16s. 10d.
8